20th June 2015
								
																						
									In
									Highway Design, Planning Application, Post Planning, Renewable energy
								
																				
												Treoes Solar Farm, Wales
The main transport focus for solar farms is the construction vehicle routing, as often the sites are in rural areas.
PEP prepared the Construction Traffic Management Plan and then as part of planning conditions, we prepared detailed construction drawings for temporary improvements to highway infrastructure to provide access to the site for HGV movements.
